Tuesday 23 April 2024

Kitchen Replacement - Day 9

The flooring was due to be laid starting today, but it was agreed to wait until the furniture has been installed.

So the tiles have been left in the hallway and Dawn got another day to do some painting - a second coat for the ceilings and walls.

Tony the fitter came by and dropped off a few boxes in advance of the installation work tomorrow. I think the boxes contain the new sinks.


Meanwhile, Dawn has got the ceiling and walls all looking good in their  Arctic Fox  colour. No point in painting over the basic white undercoat on the lower part of the walls that are going to be behind the kitchen units, though.



This is the utility room. The washer and drier will go up against this wall.


Just the Bond Street Blue wall to the left and the white gloss to do now. Well done Dawn! We're looking forward to getting things installed starting in the morning.

No comments:

Post a Comment